What is being considered behind the question, 'What is the VFM percentage?'

n952ec513914b

When involved in PFI feasibility studies and project implementation support, there are many occasions to think about VFM.

As a consultant involved in public facility development and public-private partnership projects, I often encounter such discussions as:

'What is the projected VFM percentage for this project?'

'Can't we achieve a slightly higher VFM?'

'Why is the VFM lower this time compared to other PFI projects?'

These are the kinds of conversations that come up.

VFM is an important indicator for confirming the effectiveness of introducing PFI. Therefore, it is natural to want to perceive a larger number as meaning 'the PFI effect is higher'.

However, from the perspective of someone who actually calculates VFM and examines project conditions one by one, I often spend more time worrying about whether it is truly appropriate to set this reduction rate or whether private operators will participate at this project cost than on the VFM calculation itself.

For example, if you set a high 'efficiency' rate for PFI, or what is known as the reduction rate, the calculated VFM will be higher. However, if you underestimate the PFI project costs based on that premise, the project conditions might become unprofitable for private operators.

The VFM was achieved. However, no one came to the bidding.

That cannot be called a good PFI project.

In fact, the recently published 'VFM Standard Calculation Manual (Provisional Version)' also points out that setting excessive efficiency rates can lead to a decline in planned prices, which may dampen the bidding interest of operators and lead to failed or unsuccessful bids.

That is precisely why I feel it is important to view VFM not just as a number showing 'how many percent cheaper it will be if we use PFI,' but as one of the indicators to confirm whether the project conditions currently being considered are reasonable for the public side and also viable for private operators.

What I want to convey in this article is not just 'how to calculate VFM'.

Rather, what I want public administrators to know is the importance of looking not just at 'what the VFM percentage is,' but at 'why it resulted in that VFM.'

Using the 'VFM Standard Calculation Manual (Provisional Version)' published by the Cabinet Office in July 2026 as a guide, I will organize the basics of VFM and the points you should check when you receive calculation results, incorporating a practical perspective.

1. What exactly is VFM comparing?

First, let's organize the basic mechanism of VFM.

VFM (Value For Money) literally means the concept of 'how much high-value service can be obtained for the money paid.' In VFM evaluation for PFI, it basically compares the fiscal burden when the public implements the project using the conventional method versus the fiscal burden when implemented using the PFI method.

This is where "PSC" and "PFI-LCC" come into play.

PSC (Public Sector Comparator) is the estimated amount of public financial burden over the entire project period, converted to present value, assuming the project is implemented by the public sector itself.

On the other hand, PFI-LCC (Life Cycle Cost of a PFI project) is the cost borne by the public sector over the entire project period when the same project is implemented using the PFI method.

The basic relationship is very simple.

VFM (monetary value) = PSC - PFI-LCC

For example, if the PSC is 10 billion yen and the PFI-LCC is 9.5 billion yen, the VFM is 500 million yen. Expressed as a percentage,

500 million yen ÷ 10 billion yen = 5%

is the result.

In other words, it is evaluated as "there is a possibility that the public financial burden can be reduced by 5% using the PFI method compared to the conventional method."

However, there is one important point here.

The PSC should not simply be the "amount the public has paid in the past" or the "current budget amount."

It must be set from the perspective of how much it would cost if the public sector were to implement the services requested of the private operator in this PFI project using the conventional method. Even in the standard calculation manual, it is recommended that the PSC be an estimated amount adjusted from past prices so that it represents the cost required for the public sector to achieve the service levels requested of the private operator, rather than just "past prices under the conventional method."

For example, if the PFI requires conditions such as increasing the scope and frequency of cleaning, extending opening hours, or carrying out certain repairs during the project period, but the PSC uses the costs of the current lower service level, the comparison conditions are not met in the first place.

The VFM guidelines also state that when selecting a specific project, in principle,the PSC and PFI-LCC should be calculated after setting the public service levels to be identical.is required.

Therefore, when looking at VFM, the first thing you want to check is not "what percentage it is."

"Are the PSC and PFI-LCC really being compared based on the same service levels and conditions?"

This is the first point in deciphering VFM.

2. Why "Higher VFM = Better PFI" is not always true

Once you understand the VFM mechanism, you might think, "The higher the VFM, the greater the effect of introducing PFI."

Certainly, if compared under the same conditions, a larger VFM means a greater effect in reducing the public financial burden. However, in practice, it is not that simple.

In particular, what significantly influences VFM is the "efficiency" gained through PFI. This is sometimes referred to as the "reduction rate."

For example, to simplify, let's consider a project that costs 10 billion yen under the conventional method. If we anticipate 5% efficiency from PFI, it becomes 9.5 billion yen; at 10%, it is 9 billion yen; and at 15%, it is 8.5 billion yen.

Of course, actual VFM calculation is not this simple, as it also considers financing costs, SPC establishment and operating costs, taxes, risk adjustments, and present value conversion. However, you must grasp the relationship that the higher the efficiency is set, the smaller the PFI-LCC becomes, and as a result, the VFM tends to become larger.

So, is it acceptable to think, "Since other PFI projects are seeing reduction effects of around 10%, let's set it at 10% this time as well"?

The current "VFM Standard Calculation Manual (Provisional Version)" calls for careful consideration regarding the setting of this efficiency. It is pointed out that VFM is significantly influenced by the efficiency setting, especially in situations where competition is limited and the discount rate is small.

What is even more important is that the PFI-LCC also serves as the basis for subsequent bid price calculations.

If efficiency is set too high, a large VFM can be shown in the calculations. However, if this causes the estimated price to become too low, it could result in a project that private operators view as "not profitable at this price." The manual also states that setting excessive efficiency may dampen the willingness of operators to bid, potentially leading to failed or unsuccessful bids.

VFM was achieved. However, no one came to the bid.

In this case, no matter how high the VFM figure is, it cannot be called a good PFI project.

That is precisely why, in practice, it is important to think not only about the figure of "what percentage can be reduced," but also why that efficiency can be realized.

Can efficiency be achieved by ordering design and construction together? Can life cycle costs be suppressed by including long-term maintenance and management? Can private sector ingenuity be drawn out through comprehensive ordering or performance-based ordering?

I believe that efficiency should be set as a result of having such concrete reasons.

In other words, rather than viewing VFM simply as a "number to be maximized," I feel it is closer to practical work to view it as a figure for confirming whether the currently set project conditions are appropriate while looking at both the public sector's financial burden and the private sector's business viability.

3. What has changed with this "VFM Standard Calculation Manual"?

In July 2026, the Cabinet Office published the "VFM Standard Calculation Manual (Provisional Version)."

Until now, the basic approach regarding VFM was indicated by the "Guidelines for Value For Money (VFM)." On the other hand, there were many parts where specific calculation methods were left to the managers of public facilities, etc., and there was a situation where variations could occur in practice regarding calculation methods and the thinking behind set values.

Based on this situation, this manual presents a "standard calculation method" to ensure a certain level of accuracy while reducing the workload required for VFM calculation. At the same time, an Excel-format calculation template has also been prepared, making it possible to specifically calculate PSC, PFI-LCC, VFM, etc.

Leaving the detailed calculation methods to the manual, I believe there are four points that public administrators should especially keep in mind.

① Reflect "competitive effects" in PSC as well

The first is that the approach of reflecting the effects of competition through bidding in the PSC when implementing via the conventional method has been clearly indicated.

For example, even if the facility development cost estimated by the public sector is 10 billion yen, it does not necessarily mean that a contract will be signed for 10 billion yen if ordered through the conventional method. In reality, competitive bidding takes place, and contracts are sometimes signed below the planned price.

Therefore, in the standard calculation, the portion set based on the winning bid prices of similar projects and the portion accumulated from budget unit prices, etc., are separated, and the competitive effect is reflected by multiplying the latter by the winning bid rate.

In other words, the comparison is made based on the fact that there is a competitive effect in the conventional method as well, rather than expecting efficiency improvements through private sector competition only on the PFI side.

② Do not set PFI 'efficiency' too easily

The second point is 'efficiency,' which was also touched upon in the previous chapter.

The manual presents a way of thinking about examining the extent of efficiency that can be expected through bundled, comprehensive, and performance-based ordering, while referring to the track records of similar PFI projects. It is also assumed that this will be confirmed with private business operators through soundings and the like.

In my own practical experience, I feel that simply asking, 'How much can be reduced if we use PFI?' does not easily lead to an effective answer.

This is because private business operators cannot make specific judgments unless they understand the premises, such as facility scale, scope of work, required standards, project duration, and the approach to price fluctuations.

The manual also states that when conducting soundings, it is difficult to obtain accurate information unless information such as how current price increases are incorporated into the planned price and how future price increases are reflected is provided to the extent possible.

③ Appropriately reflect price increases

The third point is price increases, which cannot be avoided in recent public facility development.

Regarding facility development costs, it is desirable to use an amount that adjusts the budget unit price at the time of input, taking into account price increases at the scheduled time of ordering and during the development period.

Also, regarding the future inflation rate, it is necessary to be careful not to simply use the most recent inflation rate as is, but to set it as a forecast of the future inflation rate over the entire project period. In addition to the Bank of Japan's corporate goods price outlook, the break-even inflation rate, consumer price index, and GDP deflator are also shown as reference information.

④ Look at 'PIRR' as well as VFM

And the fourth point is one that I personally feel is important in this manual.

In the standard calculation format, you can check not only the VFM on the public side but also the PIRR (Project Internal Rate of Return) on the private business operator side.

In other words,

'how much financial burden can be reduced for the public'

but also

'whether it is viable as a private business under those conditions'

is also something to look at.

The manual also indicates that if the PIRR falls below the cost of capital, adjustments such as increasing the fee portion of SPC expenses or raising the installment interest spread may be necessary.

Looking at these four points, it is clear that this standard calculation manual is not just a manual for making VFM easier to calculate.

Evaluating VFM under more realistic project conditions while confirming the competitive effects of the conventional method, the efficiency of PFI, future prices, and even the profitability of the private sector.

I believe that the fact that such a direction has been indicated more concretely than ever before is a major point of this manual.

4. The "five prerequisites" that drive VFM figures

As we have seen so far, VFM is not simply a figure that says "it will be X% cheaper if you use PFI." The calculation results change depending on the various prerequisites that make up the PSC and PFI-LCC.

Therefore, when government officials look at VFM calculation results, it is important to check not only the final "VFM X%" but also what kind of prerequisites that figure is calculated from.

In particular, there are five things you should check.

1. PSC - "How much would it cost using the conventional method?"

First, you want to check the PSC, which is the starting point for comparison.

As mentioned above, the PSC does not simply use current budget amounts or past project costs, but is set as the cost that would be required if the public sector realized the service level required of private operators in PFI using the conventional method.

Furthermore, in this standard calculation, the idea of reflecting the competitive effect of the conventional method using the successful bid rate for costs accumulated from budget unit prices, etc., is presented.

Therefore, it is important to check not only "What is the PSC?" but also "How was that amount set?"

2. Efficiency - "Why can it be cheaper with PFI?"

Next, what has a particularly large impact on VFM is the "efficiency" of PFI.

What is important here is not the numbers themselves, such as 5% or 10%, but "why that efficiency can be realized."

For example, can rework be reduced by ordering design and construction together? Can design that is conscious of life-cycle costs be achieved by including maintenance and management in the order? Can the ingenuity of the private sector be demonstrated through comprehensive ordering of multiple tasks or performance-based ordering?

The manual also presents the idea of confirming efficiency through integrated, comprehensive, and performance-based ordering through dialogue with private operators, while referring to the track record of similar PFI projects.

"It's not 10% because other cases are 10%, so it's 10% this time too," but can you explain the 10% for that project? This is a point you especially want to check.

3. Inflation rate: "What price level is being used for calculations?"

In recent public facility development projects, the inflation rate setting also significantly impacts VFM.

For example, if construction costs at the time of the feasibility study are treated as the order price several years later, a discrepancy with actual market prices may occur.

The standard calculation manual indicates that facility development costs should account for inflation during the development period and at the expected time of ordering. It is also important to note that the inflation rate is not the current figure, but rather a forecast of future inflation rates over the entire project period.

When looking at VFM, it is necessary to confirm not only "how much was calculated," but also "what price base is being used."

4. Discount rate: "Converting future money into present value"

What is slightly difficult to understand in VFM is the "discount rate."

PFI projects can be long-term, spanning 10, 15, or 20 years. Therefore, 1 million yen paid this year and 1 million yen paid 20 years from now cannot be compared as the same 1 million yen.

This is why the discount rate is used to convert future expenditures into present value.

The standard calculation manual recommends, in principle, using the yield on government bonds with a maturity close to the project duration as the risk-free rate.

As a public administrator, I do not think you need to understand complex present value calculations, but "what percentage the discount rate is set at and what the basis for it is" is a point you should confirm.

5. PFI-specific costs and risks: Looking at "costs that increase because it is a PFI"

Finally, one must not forget the costs that arise newly from adopting PFI.

While PFI can be expected to bring efficiencies through methods like bundled or comprehensive ordering, there are costs that did not occur or occurred in different forms under traditional methods, such as SPC establishment and operating costs, financing costs, and monitoring costs. In PFI-LCC, public burdens over the entire project period are calculated including these costs.

Also, "risk adjustment" to appropriately compare differences in risk sharing between the public and private sectors is an important element that constitutes VFM.

In other words, in PFI, it is necessary to compare not only the "costs that decrease by using PFI," but also include the "costs that increase by using PFI".

By grasping these five prerequisites, things that were not visible from the result of "VFM was 8%" alone become much clearer.

What is important when looking at VFM is not the numbers themselves, but whether there is a rational basis for the prerequisites: PSC, efficiency, inflation rate, discount rate, and PFI-specific costs and risks.

I believe that confirming this is what it means to "read VFM figures."

5. You don't need to overthink "risk adjustment"

When dealing with VFM for the first time, one of the items that is often felt to be particularly difficult to understand is "risk adjustment."

In PFI, some of the risks that were previously borne by the public sector may be borne by private business operators through contracts. Examples include increases in construction costs, delays in construction periods, failure to achieve facility performance, and increases in maintenance and management costs.

PFI-LCC includes compensation for private business operators to take on these risks. On the other hand, under the conventional method, the public sector may bear the same risks. Since comparing the two directly would not be an apples-to-apples comparison, converting the risks remaining on the public side into monetary values as much as possible and reflecting them in the PSC is the basic concept of risk adjustment.

The concept itself is not that complicated.

For example, if an additional burden of 100 million yen arises when a certain risk occurs, and the probability of that occurrence is assumed to be 10%,

100 million yen × 10% = 10 million yen

becomes the expected value of that risk.

However, in actual projects, it is not easy to accurately set figures such as "what is the probability that construction costs will increase" or "what is the probability that equipment failure will occur over 20 years."

The guidelines do not require all risks to be quantified, but rather suggest focusing on quantifying risks with a high degree of impact, or using insurance premium estimates as a reference when quantification is difficult.

When I consider risk adjustment in my own practical work, I feel that it is also important not to focus too much only on "how much the risk adjustment amount should be".

Rather, as a prerequisite to that,

"Who bears this risk under the conventional method?"

"Does the public or private sector bear it under PFI?"

"Is it really more rational to transfer this risk to the private sector?"

It is meaningful to organize these points.

PFI does not mean that as many risks as possible should be transferred to the private sector. The basic principle is that the entity that can manage the risk most appropriately should bear it.

Therefore, when public administrators look at VFM, rather than understanding all the complex calculation methods for risk adjustment, they should confirm "which risks are being transferred to the private sector, why, and how that is reflected in the VFM."

I believe that having that perspective is the first step in understanding risk adjustment.

6. VFM is not "once calculated, it's over"

Another point to keep in mind regarding VFM is that the figures calculated once cannot be used forever after.

PFI projects proceed over several years, starting from the basic concept and basic plan, followed by a feasibility study, publication of implementation policies, selection of specific projects, bid announcements, and finally, the selection of the business operator.

During this time, the prerequisites that make up VFM also change.

For example, facility development costs, which were only estimates at the feasibility study stage, become more accurate as the facility scale and required standards are finalized. Conducting soundings also reveals the extent of efficiency improvements private operators anticipate and what kind of risk-sharing would make participation feasible.

Furthermore, external environments such as prices and interest rates also change.

Especially in recent years, where construction costs and labor costs fluctuate significantly, continuing to use project costs and inflation rates calculated several years ago may lead to a discrepancy between the actual market environment and the prerequisites for VFM.

In the current "VFM Standard Calculation Manual (Provisional Version)," it is noted that since VFM can fluctuate significantly until a business operator is selected through bidding, when using VFM, PSC, or PFI-LCC to calculate the planned price or debt burden, it is desirable to reflect new information such as inflation rates and recalculate multiple times accordingly.

I feel this is a very important point in practice.

For example, even if a feasibility study results in a "VFM of 8%," that 8% is not guaranteed until the time of bidding several years later.

Rather, I think it is closer to reality to consider it as

the result of evaluating current project conditions using information available at that time

I think it is closer to reality to consider it as such.

As the project progresses, if conditions such as facility development costs, required standards, efficiency, prices, interest rates, and risk-sharing become more concrete, VFM should be updated accordingly.

Then, each time, confirm whether "there is efficiency as a PFI" and "whether private operators can participate at this project cost."

In other words, VFM is not a figure that is written once in a feasibility study report and then forgotten; I believe it is important to view it as an indicator that is continuously updated to confirm the validity of conditions at each stage of commercialization.

7. What should government officials ask when told "VFM is X%"?

I have explained the mechanism and prerequisites of VFM so far, but I do not think government officials need to understand all the complex calculation formulas.

Rather, what is important in practice is being able to confirm, when a consultant or someone else explains that "the current VFM is 8%," what kind of premises that 8% was calculated from.

As someone who explains VFM, I also feel it is important to share not just the final VFM figure, but also the underlying conditions with government officials.

Therefore, when VFM calculation results are presented, please check points such as the following.

① What is the PSC, and what is the basis for it?
This is the starting point for comparison. Check whether past project costs or current budget amounts are being used as-is, and whether the costs reflect the realization of the current required standards using the conventional method.

(2) How is the competitive effect of the conventional method reflected?
In this standard calculation, the concept of reflecting the competitive effect using the successful bid rate for parts accumulated from budget unit prices, etc., is presented.

(3) What is the efficiency percentage of the PFI?
This is an item with a significant impact on VFM. First, we confirm what level of efficiency is expected for facility development, maintenance, management, and operation.

(4) What is the basis for that efficiency?
We confirm why such efficiency is possible in this project through methods like bundling, comprehensive ordering, and performance-based ordering, rather than just saying, "because similar cases are at 10%."

(5) Is it consistent with the sounding results?
Even if it works out in the calculation, it is meaningless if it is far removed from actual market sentiment. We look at whether the opinions obtained through dialogue with private business operators are reflected in the efficiency and project conditions.

(6) How is price inflation reflected?
We confirm what price base is used for facility development costs and how price fluctuations during the period leading up to the order and during the long-term maintenance, management, and operation period are considered.

(7) What is the discount rate, and what is its basis?
The PSC and PFI-LCC converted to present value change depending on the discount rate. The standard calculation manual presents the concept of setting it by referring to government bond yields, etc.

(8) Are costs specific to PFI included?
We confirm whether costs that are necessary precisely because it is a PFI, such as SPC establishment and operation costs, financing costs, and monitoring costs, are appropriately recorded.

(9) What is the profitability for the private sector?
We check not only VFM but also PIRR and other factors. Even if it is cheap for the public side, it will not be a sustainable project if it does not work as a private business.

(10) Can we actually expect bids under these conditions?
In the end, it comes back to this. We confirm whether these are conditions under which operators can realistically participate, based not only on what percentage the VFM is, but also on the results of market research and soundings.

If you ask for explanations on these 10 points, you should be able to see quite clearly "why this VFM is the way it is" without having to follow every single calculation formula built into Excel.

What government officials and consultants should share regarding VFM is not just the final "X%" figure. Rather, I believe that sharing the preconditions that make up that figure and the reasons for those settings is what is important for effectively using VFM as a basis for project judgment.

Summary | VFM is not an "answer," but a figure for considering project conditions

As we have seen so far, VFM is an important indicator for confirming the introduction effect of PFI, but "High VFM does not equal a good PFI project."

VFM is built upon various preconditions, such as PSC, efficiency through PFI, inflation rates, discount rates, risk sharing, SPC costs, and financing costs. Therefore, the calculated VFM changes depending on how these preconditions are set.

For example, if efficiency is set high, the VFM will increase. However, if the PFI project cost is estimated too low as a result, it may become a condition that is difficult for private operators to enter, potentially leading to unsuccessful or failed bids. The current standard calculation manual also points out these concerns.

That is precisely why I believe it is important to view VFM not as an "answer for adopting PFI," but as a "figure for confirming whether the project conditions currently being considered are appropriate."

You do not create PFI conditions in order to produce a VFM.

How do you combine design, construction, maintenance, and operation? Where do you draw out the ingenuity of the private sector? How do you share risks between the public and private sectors? And how do you create conditions that are accessible to private operators while keeping the public's financial burden in check?

VFM is born as a result of examining these project conditions one by one.

I believe this order is important.

A VFM of 15% does not necessarily mean it is a good project, nor does 5% mean it is a bad one. What is important is whether that figure is based on realistic project costs, rational efficiency, appropriate price forecasts, the allocation of risks between the public and private sectors, and the business viability for private operators.

That is precisely why a higher VFM is not necessarily better.

I would like government officials to add one more question to "What is the VFM percentage?": "Why did it result in that VFM?"

Using VFM not just as a criterion for introducing PFI, but as a common language for considering realistic project conditions for both the public and private sectors might lead to better PFI projects.